Wevelgem, West Flanders · Trading since 2023

You pay for
the peak,not the kilowatt-hours.

In Flanders a part of the distribution charge follows your highest quarter-hour of the month, averaged across twelve months. One hard charging session sets a figure you keep paying all year.

  • 2023trading since
  • 2.5 kWthe peak floor
  • 12 mopeak averaged
  • Type Bor 6 mA DC
A CHARGE POINT · WHAT GETS SPECIFIED The peak, not the kWh 50 % complete Peak set per quarter-hour Averaged over 12 months Dynamic balancing fitted DC fault detection present First survey Free, no obligation Reply time « Within two working days »
What we do

Four things, and a peak we try not to create

Charging, load management, general electrical work and connection capacity. The available power gets confirmed before anything is promised.

How it works

How we work

A survey establishes the connection and the existing load before any charging power gets promised, protection and circuits are specified rather than assumed, and nothing is commissioned until an accredited body has inspected it.

Free first survey

What you want, and whether the connection you have will carry it.

Measured, not assumed

Existing load and headroom established before a design.

Specified in writing

Circuit, protection type and load management, with reasons.

Inspected then handed over

Accredited inspection first, then a board schedule for you to keep.

Working together

Ways to work with us

Quoted per installation after a survey. Nothing is quoted on the strength of a photograph of a consumer unit.

A charge point

Surveyed, specified and inspected.

  • Connection capacity confirmed first
  • Dedicated circuit
  • Type B or type A with DC detection
  • Load management specified
  • Accredited inspection before use
Ask for a survey

What we will not do

Said plainly, because it protects you too.

  • No charger on a shared circuit
  • No commissioning before inspection
  • No promised saving in euros
  • No charging power the connection cannot carry
  • No network operator timescale guaranteed
Read why

Every engagement is quoted after a free consultation. No subscription.

A typical week Mon Survey Tue Load Wed Design Thu Install Fri Test
How we work

An electrical business in Wevelgem

PA Technics is a company incorporated under Belgian law, registered with the Crossroads Bank for Enterprises under enterprise number 0803.036.670, based at Leuricock in Wevelgem in West Flanders, and trading since June 2023. Payam Asgari has been its director since incorporation. The registered activities cover general electrical installation, other construction installation, networks for electricity and telecommunications, and electrical and electronic equipment for motor vehicles.

The company is young and claims no track record it does not have. What it can set out is a specification habit, and the part worth a stranger's attention concerns cost rather than cable. Since January 2023 a component of the distribution charge in Flanders follows the monthly peak — the highest quarter-hour average of the month — averaged across the preceding twelve months and subject to a floor. A charger that takes its full rated power during a busy evening can therefore raise a bill for a year on the strength of fifteen minutes. The fix is load management that modulates against the whole building, which is why it gets specified with the charger rather than offered as an upgrade. The second habit is protection: a charger can produce smooth DC residual current that stops an ordinary device operating, so the circuit is dedicated and the protection is type B or type A with six milliamp DC detection.

See how we work

Frequently asked

The questions we get most

What exactly is the peak I keep paying for?

The capacity component of the Flemish distribution charge is calculated from your monthly peak, which is the highest quarter-hourly average offtake recorded during that month, and the figure used is the average of those monthly peaks across the preceding twelve months, subject to a floor. The practical meaning is that a quarter of an hour of heavy simultaneous use does not cost you once; it sits in a rolling average for the next year. That is why we ask what else runs in the evening before specifying a charge point, and why the answer changes the design.

Is dynamic load balancing really necessary?

It is the difference between a charger that costs you only energy and one that also raises your capacity charge. Dynamic balancing measures what the rest of the building is drawing and allocates the remainder to the car, so the total never pushes past a set ceiling. On most evenings nothing is noticeable. On the few evenings when the oven, the heat pump and the car would have coincided, the car charges a little more slowly and no new peak is created. Static limiting caps the charger at a fixed figure regardless of the house, which is cruder but still far better than nothing.

Will this reduce my bill, and by how much?

It should reduce the capacity component, and we will not put a figure on it. The amount depends on the tariff applicable to you, on your supply contract, and above all on how you actually use electricity, none of which we control. Anyone who quotes you a precise annual saving before seeing a year of your consumption is guessing, and the guess will be optimistic. What we can say is what creates a peak and what prevents one, which is the part within an installer's control.

Why can a charger need a special residual current device?

Because of the kind of fault current it can produce. Charging equipment can generate smooth direct residual current, and a device of type AC or type A may be unable to detect it — worse, that current can impair the device so it fails to operate on faults it would otherwise catch. Protection therefore has to be a type B device, or a type A device combined with equipment detecting smooth DC residual current at six milliamps, which many chargers provide internally. The circuit is also dedicated. If a quotation does not mention any of this, it is worth asking which arrangement is being proposed.

Can I just have the fastest charger available?

Only if your connection carries it, which is the first thing to establish rather than the last. Many homes are on a single-phase connection that simply will not support an eleven kilowatt charge point, and raising the capacity or converting to three phase means applying to the distribution network operator, which sets the cost and the timescale. We find out before quoting. Quite often the better answer is a slower charger with good load management, because a car parked overnight does not need to be charged in forty minutes.

Do you make vehicle parts?

No, and this answer exists because one of our registered activity codes refers to the manufacture of electrical and electronic equipment for motor vehicles. We install and work on charging infrastructure and building electrical systems. We do not place electrical or electronic equipment for vehicles on the market under our own name, which would carry its own type-approval and electromagnetic compatibility obligations, and we make no declaration of conformity as a manufacturer of such equipment.

A car arriving, or a board nobody understands?

A free first survey, with no obligation. If your connection will not carry what you want, you will hear it first rather than last.